Field engineering · Network construction

Construction decides how long the network lasts.

District heating mains are welded steel, buried hot, and designed for a service life of fifty years or more. Whether they get there depends on the work in the trench: pre-stressing, jointing, backfill and commissioning. This site collects the engineering knowledge for that work, with sources you can check.

Pre-insulated transmission main in open trench. Lomma, Sweden · 29 June 2026

Guides

Pipe & insulation selection

Compare single pipe and TwinPipe before you order

Dimension, insulation series and pipe system are often chosen by habit. The interactive calculator compares hydraulic capacity, heat loss, joint count and the present value of the difference, based on Kingspan LOGSTOR product data.

Run the comparison →
Installation method

Cold-laid vs preheated: the cost of expansion zones

Cold installation needs expansion legs, foam cushions, a wider trench and often a longer route. Preheating avoids most of that, but takes time during installation. The guide goes through what each method requires of the route and the excavation, and when each is the cheaper choice.

Read the guide →
Thermal pre-stressing

Why pipes are pre-stressed, and how preheating is done

Why buried steel pipes must be pre-stressed, the installation methods EN 13941 recognises, and how thermal preheating with water is executed and documented. Includes an interactive calculator for water volume, energy and axial stress.

Read the guide →
Worksite safety

Working safely with hot network water

Network water runs at 70–120 °C under pressure, and the most exposed moments are temporary hose connections during preheating, flushing and commissioning. The guide applies the hierarchy of controls to that work, written for the people who plan it.

Read the guide →
Curated sources

The best practice library

Standards, manufacturer manuals and research guidebooks worth having open on the second screen: EN 13941, AGFW rules, Kingspan LOGSTOR manuals, IEA DHC guidebooks and more, with a note on what each covers and who it is for.

Browse the library →

Why this site exists

Most of what is published about district heating deals with planning, economics and decarbonisation. Little of it deals with construction, even though that is where most premature network failures start: a joint made in bad weather, or pre-stressing skipped to save a day. The engineers who know how to avoid these mistakes are retiring, and their knowledge is rarely written down.

This site is an attempt to change that. Every claim is referenced to a standard, a manufacturer's design manual, or physics you can recalculate yourself. Opinions are marked as opinions, and our commercial interest is described on the about page.

Field trials 2026–2027

The team behind this site is developing equipment for water-based thermal preheating and hose-failure protection, and is recruiting a limited number of network operators and contractors for field trials. Participants get early access to the equipment and a say in how the method is documented.

Register interest via Heatmixer →